为什么在大湾区做
Shenzhen's EMS density means fast, cost-effective PCBA: SMT lines, BOM sourcing, AOI/X-ray inspection and functional test. Anchormere owns quality and consolidates your multi-SKU orders.
我们能整合的能力
典型规格与时效
| Parameter | Detail |
|---|---|
| MOQ | 500 pcs per SKU |
| Typical lead time | 15–25 days |
| Cluster | Shenzhen / Dongguan |
| Certs on request | IPC-A-610, RoHS, UL |
| Quote time | 48 hours for standard BOM |
常见问题
500 pcs per item. Mixed-SKU consolidation across one shipment is allowed.
Standard items are quoted within 48 hours by an engineer, with lead time and Incoterms stated up front.
By-process photo gallery, recorded shop-floor video, a certificate & document wall, and live inspection by appointment.
T/T to Shenzhen Senya Industrial Co., Ltd.: 30% deposit to start, 70% before shipment (ship after full payment).
Yes. We integrate assembled electronics and PCBA, and consolidate finished devices into one shipment with a full export document package.
发一张照片或一个料号,48 小时内工程师回复
Or return to the parent category page to see the full scope we integrate.